Page History
...
- Tim will be out of the office Sept 1 2 through 7 (returning on 8th). Volunteers to lead next week's meeting at 15:00 UTC (on Sept 7)?
- DSpace 6.0 Status. RC3 tentative date for Sept 1. Are we on target?
- Two "high priority" PRs left: https://github.com/DSpace/DSpace/pulls?q=is%3Apr+is%3Aopen+label%3A%22high+priority%22
- "Must Have" tickets that need resolution before 6.0 Final (These are all unresolved tickets flagged "Fix for 6.0" with a priority of "Major" or above.)
Jira server DuraSpace JIRA columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution maximumIssues 20 jqlQuery project = DS AND status in (Received, "More Details Needed", "Volunteer Needed", "Code Review Needed", Accepted, "Awaiting Documentation") AND priority in (Blocker, Critical, Major) AND fixVersion = 6.0 serverId c815ca92-fd23-34c2-8fe3-956808caf8c5
- Other "quick win" PRs, which are "nice to haves": https://github.com/DSpace/DSpace/pulls?q=is%3Aopen+is%3Apr+label%3A%22quick+win%22+milestone%3A6.0
- Other 6.0 "known issues" (Any tickets in these lists that are not listed above may be rescheduled for 6.1 or later, if no volunteers are found)
- Other unresolved issues flagged from "testathon":https://jira.duraspace.org/issues/?jql=resolution%20%3D%20Unresolved%20AND%20labels%20%3D%20testathon
- All the PRs flagged for 6.0 (some may need rescheduling): https://github.com/DSpace/DSpace/pulls?q=is%3Aopen+is%3Apr+milestone%3A6.0
...
Overview
Content Tools