Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Tim will be out-of-office next week (DuraSpace Staff meetings), Oct 17 through 21.  Volunteers to lead next Dev Meeting on Oct 19 at 15:00UTC?
  • Art Lowel (Atmire) started a Doodle Poll to talk about next steps with Angular 2 UI / DSpace 7: http://doodle.com/poll/5ycsku6r872vkzdn

Discussion Topics

  1. DSpace 54.7 Status: Where do we stand with the 54.x (backport) release?
  2. DSpace 6.0 Status. Are we ready for a final RC4? followed by 6.0 (about one week later)?
    1. "Must Have" tickets that need resolution before 6.0 Final (These are all unresolved tickets flagged "Fix for 6.0" with a priority of "Major" or above.)
      Jira
      serverDuraSpace JIRA
      columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
      maximumIssues20
      jqlQueryproject = DS AND status in (Received, "More Details Needed", "Volunteer Needed", "Code Review Needed", Accepted, "Awaiting Documentation") AND priority in (Blocker, Critical, Major) AND fixVersion = 6.0
      serverIdc815ca92-fd23-34c2-8fe3-956808caf8c5
    2. Other "quick win" PRs, which are "nice to haves": https://github.com/DSpace/DSpace/pulls?q=is%3Aopen+is%3Apr+label%3A%22quick+win%22+milestone%3A6.0
  3. Other 6.0 "known issues" (Any tickets in these lists that are not listed above may be rescheduled for 6.1 or later, if no volunteers are found)
    1. Other unresolved issues flagged from "testathon":https://jira.duraspace.org/issues/?jql=resolution%20%3D%20Unresolved%20AND%20labels%20%3D%20testathon
    2. All the PRs flagged for 6.0 (some may need rescheduling): https://github.com/DSpace/DSpace/pulls?q=is%3Aopen+is%3Apr+milestone%3A6.0

...