Dial by your location +1 669 900 6833 US (San Jose) +1 929 205 6099 US (New York) +1 253 215 8782 US (Tacoma) +1 301 715 8592 US (Washington DC) +1 312 626 6799 US (Chicago) +1 346 248 7799 US (Houston) 877 853 5257 US Toll-free 888 475 4499 US Toll-free Meeting ID: 843 7861 5572 Passcode: 556561 Find your local number: https://lyrasis.zoom.us/u/kerqtGDrJ4
Brian: Indexing is a few magnitudes slower than it should be. The Sparql query itself works as fast as expected. Loading of 1.2 million triples triggered this slow indexing. Tbox extensions that were present when this issue popped up will be also added, so that the problem will be easier to recreate.
Completed sprint
Dragan: The sprint was successful, and people were motivated to finish their features. The bad is that PR’s created at the end of the sprint were not reviewed and the sprint wasnt properly closed as everyone was focused on finishing their tasks throughout the entire sprint. Also, onboarding new members to the community isn't easy. 50-60% of tasks were finished, the base project for UI is setup, there is login endpoint, conditional steps, and crud operations.
This PR contains n3 templates that represent dynamic actions for crud operations. It is useful for demonstration of what we have built so far, as well as development of the UI. The question is whether we want to use those n3 files and operations as test data or not, especially if we will change the structure of DynamicAPI components such as Parameters and OperationData, that would render these n3 files incorrect.
Sprint planning
August or September?
Running into following sprint if we choose September. Dragan is available for both.
Topic for next sprint?
Although only 2 sprints were planned for the DynamicAPI, we will probably need 2 more sprints, which means that data ingestion will have to be postponed for the next year.
Who can participate? We’ll follow up in the next couple weeks.
Work over summer
Regular meetings over July, then biweekly meetings?
Or biweekly for July and August
For now the plan is to have biweekly meetings from July 15th-August 15th.